PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed sheathing around the perimeter of the low roof Facing North-West.jpg Installing copper piping at the 2nd floor bathrooms.jpg Installing copper piping at the 3rd floor bathrooms Facing West.jpg Laying out block at Break Room 131 Facing North-West.jpg Setting the door frame at the Sally port Entrance (West Elevation).jpg
Previous page Setting the door frame at the Sally port Entrance (West Elevation)
Setting the door frame at the Sally port Entrance (West Elevation)